MOVE-INS THIS SUMMER AT 8 OCTAVIA

MOVE-INS THIS SUMMER AT 8 OCTAVIA

Construction at 8 Octavia is moving along and we are excited to share the building’s louver system has begun installation and the exterior façade is starting to reveal itself. The wide-plank oak flooring from the Benedictine monastery of Admont, Austria arrived last week and will soon be set within each residence.